Thank you for visiting nature.com. You are using a browser version with limited support for CSS. To obtain the best experience, we recommend you use a more up to date browser (or turn off compatibility mode in Internet Explorer). In the meantime, to ensure continued support, we are displaying the site without styles and JavaScript.

  • View all journals
  • Explore content
  • About the journal
  • Publish with us
  • Sign up for alerts
  • Open access
  • Published: 24 May 2024

Beyond probability-impact matrices in project risk management: A quantitative methodology for risk prioritisation

  • F. Acebes   ORCID: orcid.org/0000-0002-4525-2610 1 ,
  • J. M. González-Varona 2 ,
  • A. López-Paredes 2 &
  • J. Pajares 1  

Humanities and Social Sciences Communications volume  11 , Article number:  670 ( 2024 ) Cite this article

2552 Accesses

2 Altmetric

Metrics details

  • Business and management

The project managers who deal with risk management are often faced with the difficult task of determining the relative importance of the various sources of risk that affect the project. This prioritisation is crucial to direct management efforts to ensure higher project profitability. Risk matrices are widely recognised tools by academics and practitioners in various sectors to assess and rank risks according to their likelihood of occurrence and impact on project objectives. However, the existing literature highlights several limitations to use the risk matrix. In response to the weaknesses of its use, this paper proposes a novel approach for prioritising project risks. Monte Carlo Simulation (MCS) is used to perform a quantitative prioritisation of risks with the simulation software MCSimulRisk. Together with the definition of project activities, the simulation includes the identified risks by modelling their probability and impact on cost and duration. With this novel methodology, a quantitative assessment of the impact of each risk is provided, as measured by the effect that it would have on project duration and its total cost. This allows the differentiation of critical risks according to their impact on project duration, which may differ if cost is taken as a priority objective. This proposal is interesting for project managers because they will, on the one hand, know the absolute impact of each risk on their project duration and cost objectives and, on the other hand, be able to discriminate the impacts of each risk independently on the duration objective and the cost objective.

Similar content being viewed by others

risk management in project management research paper

A case study on the relationship between risk assessment of scientific research projects and related factors under the Naive Bayesian algorithm

risk management in project management research paper

Compound Matrix-Based Project Database (CMPD)

risk management in project management research paper

Risk identification approaches and the number of risks identified: the use of work breakdown structure and business process

Introduction.

The European Commission ( 2023 ) defines a project as a temporary organizational structure designed to produce a unique product or service according to specified constraints, such as time, cost, and quality. As projects are inherently complex, they involve risks that must be effectively managed (Naderpour et al. 2019 ). However, achieving project objectives can be challenging due to unexpected developments, which often disrupt plans and budgets during project execution and lead to significant additional costs. The Standish Group ( 2022 ) notes that managing project uncertainty is of paramount importance, which renders risk management an indispensable discipline. Its primary goal is to identify a project’s risk profile and communicate it by enabling informed decision making to mitigate the impact of risks on project objectives, including budget and schedule adherence (Creemers et al. 2014 ).

Several methodologies and standards include a specific project risk management process (Axelos, 2023 ; European Commission, 2023 ; Project Management Institute, 2017 ; International Project Management Association, 2015 ; Simon et al. 1997 ), and there are even specific standards and guidelines for it (Project Management Institute, 2019 , 2009 ; International Organization for Standardization, 2018 ). Despite the differences in naming each phase or process that forms part of the risk management process, they all integrate risk identification, risk assessment, planning a response to the risk, and implementing this response. Apart from all this, a risk monitoring and control process is included. The “Risk Assessment” process comprises, in turn, risk assessments by qualitative methods and quantitative risk assessments.

A prevalent issue in managing project risks is identifying the significance of different sources of risks to direct future risk management actions and to sustain the project’s cost-effectiveness. For many managers busy with problems all over the place, one of the most challenging tasks is to decide which issues to work on first (Ward, 1999 ) or, in other words, which risks need to be paid more attention to avoid deviations from project objectives.

Given the many sources of risk and the impossibility of comprehensively addressing them, it is natural to prioritise identified risks. This process can be challenging because determining in advance which ones are the most significant factors, and how many risks merit detailed monitoring on an individual basis, can be complicated. Any approach that facilitates this prioritisation task, especially if it is simple, will be welcomed by those willing to use it (Ward, 1999 ).

Risk matrices emerge as established familiar tools for assessing and ranking risks in many fields and industry sectors (Krisper, 2021 ; Qazi et al. 2021 ; Qazi and Simsekler, 2021 ; Monat and Doremus, 2020 ; Li et al. 2018 ). They are now so commonplace that everyone accepts and uses them without questioning them, along with their advantages and disadvantages. Risk matrices use the likelihood and potential impact of risks to inform decision making about prioritising identified risks (Proto et al. 2023 ). The methods that use the risk matrix confer higher priority to those risks in which the product of their likelihood and impact is the highest.

However, the probability-impact matrix has severe limitations (Goerlandt and Reniers, 2016 ; Duijm, 2015 ; Vatanpour et al. 2015 ; Ball and Watt, 2013 ; Levine, 2012 ; Cox, 2008 ; Cox et al. 2005 ). The main criticism levelled at this methodology is its failure to consider the complex interrelations between various risks and use precise estimates for probability and impact levels. Since then, increasingly more academics and practitioners are reluctant to resort to risk matrices (Qazi et al. 2021 ).

Motivated by the drawbacks of using risk matrices or probability-impact matrices, the following research question arises: Is it possible to find a methodology for project risk prioritisation that overcomes the limitations of the current probability-impact matrix?

To answer this question, this paper proposes a methodology based on Monte Carlo Simulation that avoids using the probability-impact matrix and allows us to prioritise project risks by evaluating them quantitatively, and by assessing the impact of risks on project duration and the cost objectives. With the help of the ‘MCSimulRisk’ simulation software (Acebes et al. 2024 ; Acebes et al. 2023 ), this paper determines the impact of each risk on project duration objectives (quantified in time units) and cost objectives (quantified in monetary units). In this way, with the impact of all the risks, it is possible to establish their prioritisation based on their absolute (and not relative) importance for project objectives. The methodology allows quantified results to be obtained for each risk by differentiating between the project duration objective and its cost objective.

With this methodology, it also confers the ‘Risk Assessment’ process cohesion and meaning. This process forms part of the general Risk Management process and is divided into two subprocesses: qualitative and quantitative risk analyses (Project Management Institute, 2017 ). Although Monte Carlo simulation is widely used in project risk assessments (Tong et al. 2018 ; Taroun, 2014 ), as far as we know, the literature still does not contain references that use the data obtained in a qualitative analysis (data related to the probability and impact of each identified risk) to perform a quantitative risk analysis integrated into the project model. Only one research line by A. Qazi (Qazi et al. 2021 ; Qazi and Dikmen, 2021 ; Qazi and Simsekler, 2021 ) appears, where the authors propose a risk indicator with which they determine the level of each identified risk that concerns the established threshold. Similarly, Krisper ( 2021 ) applies the qualitative data of risk factors to construct probability functions, but once again falls in the error of calculating the expected value of the risk for risk prioritisation. In contrast, the novelty proposed in this study incorporates into the project simulation model all the identified risks characterised by their probability and impact values, as well as the set of activities making up the project.

In summary, instead of the traditional risk prioritisation method to qualitatively estimate risk probabilities and impacts, we model probabilities and impacts (duration and cost) at the activity level as distribution functions. When comparing both methods (traditional vs. our proposal), the risk prioritisation results are entirely different and lead to a distinct ranking.

From this point, and to achieve our purpose, the article comes as follows. Literature review summarises the relevant literature related to the research. Methodology describes the suggested methodology. Case study presents the case study used to show how to apply the presented method before discussing the obtained results. Finally, Conclusions draws conclusions about the proposed methodology and identifies the research future lines that can be developed from it.

Literature review

This section presents the literature review on risk management processes and probability-impact matrices to explain where this study fits into existing research. This review allows us to establish the context where our proposal lies in integrated risk management processes. Furthermore, it is necessary to understand the reasons for seeking alternatives to the usual well-known risk matrices.

Risk management methodologies and standards

It is interesting to start with the definition of ‘Risk’ because it is a term that is not universally agreed on, even by different standards and norms. Thus, for example, the International Organization for Standardization ( 2018 ) defines it as “the effect of uncertainty on objectives”, while the Project Management Institute ( 2021 ) defines it as “an uncertain event or condition that, if it occurs, has a positive or negative effect on one or more project objectives”. This paper adopts the definition of risk proposed by Hillson ( 2014 ), who uses a particular concept: “risk is uncertainty that matters”. It matters because it affects project objectives and only the uncertainties that impact the project are considered a ‘risk’.

Other authors (Elms, 2004 ; Frank, 1999 ) identify two uncertainty categories: aleatoric, characterised by variability and the presence of a wide range of possible values; epistemic, which arises due to ambiguity or lack of complete knowledge. Hillson ( 2014 ) classifies uncertainties into four distinct types: aleatoric, due to the reliability of activities; stochastic, recognised as a risk event or a possible future event; epistemic, also due to ambiguity; ontological, that which we do not know (black swan). Except for ontological uncertainty, which cannot be modelled due to absolute ignorance of risk, the other identified uncertainties are incorporated into our project model. For this purpose, the probability and impact of each uncertainty are modelled as distribution functions to be incorporated into Monte Carlo simulation.

A risk management process involves analysing the opportunities and threats that can impact project objectives, followed by planning appropriate actions for each one. This process aims to maximise the likelihood of opportunities occurring and to minimise the likelihood of identified threats materialising.

Although it is true that different authors have proposed their particular way of understanding project risk management (Kerzner, 2022 ; Hillson and Simon, 2020 ; Chapman and Ward, 2003 ; Chapman, 1997 ), we wish to look at the principal methodologies, norms and standards in project management used by academics and practitioners to observe how they deal with risk (Axelos, 2023 ; European Commission, 2023 ; International Organization for Standardization, 2018 ; Project Management Institute, 2017 ; International Project Management Association, 2015 ) (Table 1 ).

Table 1 shows the main subprocesses making up the overall risk management process from the point of view of each different approach. All the aforementioned approaches contain a subprocess related to risk assessment. Some of these approaches develop the subprocess by dividing it into two parts: qualitative assessment and quantitative assessment. Individual project risks are ranked for further analyses or action with a qualitative assessment by evaluating the probability of their occurrence and potential impact. A quantitative assessment involves performing a numerical analysis of the joint effect of the identified individual risks and additional sources of uncertainty on the overall project objectives (Project Management Institute, 2017 ). In turn, all these approaches propose the probability-impact or risk matrix as a technique or tool for prioritising project risks.

Within this framework, a ranking of risks by a quantitative approach applies as opposed to the qualitative assessment provided by the risk matrix. To do so, we use estimates of the probability and impact associated with each identified risk. The project model includes these estimates to determine the absolute value of the impact of each risk on time and cost objectives.

Probability-impact matrix

The risk matrix, or probability-impact matrix, is a tool included in the qualitative analysis for risk management and used to analyse, visualise and prioritise risks to make decisions on the resources to be employed to combat them (Goerlandt and Reniers, 2016 ; Duijm, 2015 ). Its well-established use appears in different sectors, ranging from the construction industry (Qazi et al. 2021 ), oil and gas industries (Thomas et al. 2014 ), to the healthcare sector (Lemmens et al. 2022 ), engineering projects (Koulinas et al. 2021 ) and, of course, project management (International Organization for Standardization, 2019 ; Li et al. 2018 ).

In a table, the risk matrix represents the probability (usually on the vertical axis of the table) and impact (usually on the horizontal axis) categories (Ale et al. 2015 ). These axes are further divided into different levels so that risk matrices of 3×3 levels are found with three levels set for probability and three others to define impact, 5 × 5, or even more levels (Duijm, 2015 ; Levine, 2012 ; Cox, 2008 ). The matrix classifies risks into different risk categories, normally labelled with qualitative indicators of severity (often colours like “Red”, “Yellow” and “Green”). This classification combines each likelihood level with every impact level in the matrix (see an example of a probability-impact matrix in Fig. 1 ).

figure 1

Probability – impact matrix. An example of use.

There are three different risk matrix typologies based on the categorisation of likelihood and impact: qualitative, semiquantitative, and quantitative. Qualitative risk matrices provide descriptive assessments of probability and consequence by establishing categories as “low,” “medium” or “high” (based on the matrix’s specific number of levels). In contrast, semiquantitative risk matrices represent the input categories by ascending scores, such as 1, 2, or 3 (in a 3×3 risk matrix), where higher scores indicate a stronger impact or more likelihood. Finally, in quantitative risk matrices, each category receives an assignment of numerical intervals corresponding to probability or impact estimates. For example, the “Low” probability level is associated with a probability interval [0.1 0.3] (Li et al. 2018 ).

Qualitative matrices classify risks according to their potential hazard, depending on where they fit into the matrix. The risk level is defined by the “colour” of the corresponding cell (in turn, this depends on the probability and impact level), with risks classified with “red” being the most important and the priority ones to pay attention to, but without distinguishing any risks in the different cells of the same colour. In contrast, quantitative risk matrices allow to classify risks according to their risk level (red, yellow, or green) and to prioritise each risk in the same colour by indicating which is the most important. Each cell is assigned a colour and a numerical value, and the product of the value is usually assigned to the probability level and the value assigned to the impact level (Risk = probability × impact).

Risk matrix use is frequent, partly due to its simple application and easy construction compared to alternative risk assessment methods (Levine, 2012 ). Risk matrices offer a well-defined structure for carrying out a methodical risk assessment, provide a practical justification for ranking and prioritising risks, visually and attractively inform stakeholders, among other reasons (Talbot, 2014 ; Ball and Watt, 2013 ).

However, many authors identify problems in using risk matrices (Monat and Doremus, 2020 ; Peace, 2017 ; Levine, 2012 ; Ni et al. 2010 ; Cox, 2008 ; Cox et al. 2005 ), and even the International Organization for Standardization ( 2019 ) indicates some drawbacks. The most critical problems identified in using risk matrices for strategic decision-making are that risk matrices can be inaccurate when comparing risks and they sometimes assign similar ratings to risks with significant quantitative differences. In addition, there is the risk of giving excessively high qualitative ratings to risks that are less serious from a quantitative perspective. This can lead to suboptimal decisions, especially when threats have negative correlations in frequency and severity terms. Such lack of precision can result in inefficient resource allocation because they cannot be based solely on the categories provided by risk matrices. Furthermore, the categorisation of the severity of consequences is subjective in uncertainty situations, and the assessment of probability, impact and risk ratings very much depends on subjective interpretations, which can lead to discrepancies between different users when assessing the same quantitative risks.

Given this background, several authors propose solutions to the posed problems. Goerlandt and Reniers ( 2016 ) review previous works that have attempted to respond to the problems identified with risk matrices. For example, Markowski and Mannan ( 2008 ) suggest using fuzzy sets to consider imprecision in describing ordinal linguistic scales. Subsequently, Ni et al. ( 2010 ) propose a methodology that employs probability and consequence ranks as independent score measures. Levine ( 2012 ) puts forward the use of logarithmic scales on probability and impact axes. Menge et al. (2018) recommend utilising untransformed values as scale labels due to experts’ misunderstanding of logarithmic scales. Ruan et al. ( 2015 ) suggest an approach that considers decision makers’ risk aversion by applying the utility theory.

Other authors, such as Duijm ( 2015 ), propose a continuous probability consequence diagram as an alternative to the risk matrix, and employing continuous scales instead of categories. They also propose utilising more comprehensive colour ranges in risk matrices whenever necessary to prioritise risks and to not simply accept them. In contrast, Monat and Doremus ( 2020 ) put forward a new risk prioritisation tool. Alternatively, Sutherland et al. ( 2022 ) suggest changing matrix size by accommodating cells’ size to the risk’s importance. Even Proto et al. ( 2023 ) recommend avoiding colour in risk matrices so that the provided information is unbiased due to the bias that arises when using coloured matrices.

By bearing in mind the difficulties presented by the results offered by risk matrices, we propose a quantitative method for risk prioritisation. We use qualitative risk analysis data by maintaining the estimate of the probability of each risk occurring and its potential impact. Nevertheless, instead of entering these data into the risk matrix, our project model contains them for Monte Carlo simulation. As a result, we obtain a quantified prioritisation of each risk that differentiates the importance of each risk according to the impact on cost and duration objectives.

Methodology

Figure 2 depicts the proposed method for prioritising project risks using quantitative techniques. At the end of the process, and with the prioritised risks indicating the absolute value of the impact of each risk on the project, the organisation can efficiently allocate resources to the risks identified as the most critical ones.

figure 2

Quantitative Risk Assessment Flow Chart.

The top of the diagram indicates the risk phases that belong to the overall risk management process. Below them it reflects the steps of the proposed model that would apply in each phase.

The first step corresponds to the project’s “ risk identification ”. Using the techniques or tools established by the organisation (brainstorming, Delphi techniques, interviews, or others), we obtain a list of the risks ( R ) that could impact the project objectives (Eq. 1 ), where m is the number of risks identified in the project.

Next we move on to the “ risk estimation ” phase, in which a distribution function must be assigned to the probability that each identified risk will appear. We also assign the distribution function associated with the risk’s impact. Traditionally, the qualitative risk analysis defines semantic values (low, medium, high) to assign a level of probability and risk impact. These semantic values are used to evaluate the risk in the probability-impact matrix. Numerical scales apply in some cases, which help to assign a semantic level to a given risk (Fig. 3 ).

figure 3

Source: Project Management Institute ( 2017 ).

Our proposed model includes the three uncertainty types put forward by Hillson ( 2014 ), namely aleatoric, stochastic and epistemic, to identify and assess different risks. Ontological uncertainty is not considered because it goes beyond the limits of human knowledge and cannot, therefore, be modelled (Alleman et al. 2018a ).

A risk can have aleatoric uncertainty as regards the probability of its occurrence, and mainly for its impact if its value can fluctuate over a set range due to its variability. This aleatoric risk uncertainty can be modelled using a probability distribution function (PDF), exactly as we do when modelling activity uncertainty (Acebes et al. 2015 , 2014 ). As the risk management team’s (or project management team’s) knowledge of the project increases, and as more information about the risk becomes available, the choice of the PDF (normal, triangular, beta, among others) and its parameters become more accurate.

A standard definition of risk is “an uncertain event that, if it occurs, may impact project objectives” (Project Management Institute, 2017 ). A risk, if defined according to the above statement, perfectly matches the stochastic uncertainty definition proposed by Hillson ( 2014 ). Moreover, one PDF that adequately models this type of uncertainty is a Bernoulli distribution function (Vose, 2008 ). Thus for deterministic risk probability estimates (the same as for risk impact), we model this risk (probability and impact) with a Bernoulli-type PDF that allows us to introduce this type of uncertainty into our simulation model.

Finally, epistemic uncertainties remain to be modelled, such as those for which we do not have absolute information about and that arise from a lack of knowledge (Damnjanovic and Reinschmidt, 2020 ; Alleman et al. 2018b ). In this case, risks (in likelihood and impact terms) are classified into different levels, and all these levels are assigned a numerical scale (as opposed to the methodology used in a qualitative risk analysis, where levels are classified with semantic values: “high”, “medium” and “low”).

“ Epistemic uncertainty is characterised by not precisely knowing the probability of occurrence or the magnitude of a potential impact. Traditionally, this type of risk has been identified with a qualitative term: “Very Low”, “Low”, “Medium”, “High” and “Very High” before using the probability-impact matrix. Each semantic category has been previously defined numerically by identifying every numerical range with a specific semantic value (Bae et al. 2004 ). For each established range, project managers usually know the limits (upper and lower) between which the risk (probability or impact) can occur. However, they do not certainly know the value it will take, not even the most probable value within that range. Therefore, we employ a uniform probability function to model epistemic uncertainty (i.e., by assuming that the probability of risk occurrence lies within an equiprobable range of values). Probabilistic representations of uncertainty have been successfully employed with uniform distributions to characterise uncertainty when knowledge is sparse or absent (Curto et al. 2022 ; Vanhoucke, 2018 ; Helton et al. 2006 ).

The choice of the number and range of each level should be subject to a thorough analysis and consideration by the risk management team. As each project is unique, there are ranges within which this type of uncertainty can be categorised. Different ranges apply to assess likelihood and impact. Furthermore for impact, further subdivision helps to distinguish between impact on project duration and impact on project costs. For example, when modelling probability, we can set five probability levels corresponding to intervals: [0 0.05], [0.05 0.2], [0.2 0.5], and so on. With the time impact, for example, on project duration, five levels as follows may apply: [0 1], [1 4], [4 12], …. (measured in weeks, for example).

Modelling this type of uncertainty requires the risk management team’s experience, the data stored on previous projects, and constant consultation with project stakeholders. The more project knowledge available, the more accurate the proposed model is for each uncertainty, regardless of it lying in the number of intervals, their magnitude or the type of probability function (PDF) chosen to model that risk.

Some authors propose using uniform distribution functions to model this type of epistemic uncertainty because it perfectly reflects lack of knowledge about the expected outcome (Eldosouky et al. 2014 ; Vose, 2008 ). On the contrary, others apply triangular functions, which require more risk knowledge (Hulett, 2012 ). Following the work by Curto et al. ( 2022 ), we employ uniform distribution functions.

As a result of this phase, we obtain the model and the parameters that model the distribution functions of the probability ( P ) and impact ( I ) of each identified risk in the previous phase (Eq. 2 ).

Once the risks identified in the project have been defined and their probabilities and impacts modelled, we move on to “ quantitative risk prioritisation ”. We start by performing MCS on the planned project model by considering only the aleatoric uncertainty of activities. In this way, we learn the project’s total duration and cost, which is commonly done in a Monte Carlo analysis. In Monte Carlo Methods (MCS), expert judgement and numerical methods are combined to generate a probabilistic result through simulation routine (Ammar et al. 2023 ). This mathematical approach is noted for its ability to analyse uncertain scenarios from a probabilistic perspective. MCS have been recognised as outperforming other methods due to their accessibility, ease of use and simplicity. MCS also allow the analysis of opportunities, uncertainties, and threats (Al-Duais and Al-Sharpi, 2023 ). This technique can be invaluable to risk managers and helpful for estimating project durations and costs (Ali Elfarra and Kaya, 2021 ).

As inputs to the simulation process, we include defining project activities (duration, cost, precedence relationship). We also consider the risks identified in the project, which are those we wish to prioritise and to obtain a list ordered by importance (according to their impact on not only duration, but also on project cost). The ‘MCSimulRisk’ software application (Acebes, Curto, et al. 2023 ; Acebes, De Antón, et al. 2023 ) allows us to perform MCS and to obtain the main statistics that result from simulation (including percentiles) that correspond to the total project duration ( Tot_Dur ) and to its total cost ( Tot_Cost ) (Eq. 3 ).

Next, we perform a new simulation by including the first of the identified risks ( R 1 ) in the project model, for which we know its probability ( P 1 ) and its Impact ( I 1 ). After MCS, we obtain the statistics corresponding to this simulation ([ Tot_Dur 1 Tot_Cost 1 ]). We repeat the same operation with each identified risk ( R i , i  =  1, …, m ) and obtain the main statistics corresponding to each simulation (Eq. 4 ).

Once all simulations (the same number as risks) have been performed, we must choose a confidence percentile to calculate risk prioritisation (Rezaei et al. 2020 ; Sarykalin et al. 2008 ). Given that the total duration and cost results available to us, obtained by MCS, are stochastic and have variability (they are no longer constant or deterministic), we must choose a percentile (α) that conveys the risk appetite that we are willing to assume when calculating. Risk appetite is “ the amount and type of risk that an organisation is prepared to pursue, retain or take ” (International Organization for Standardization, 2018 ).

A frequently employed metric for assessing risk in finance is the Value at Risk (VaR) (Caron, 2013 ; Caron et al. 2007 ). In financial terms, it is traditional to choose a P95 percentile as risk appetite (Chen and Peng, 2018 ; Joukar and Nahmens, 2016 ; Gatti et al. 2007 ; Kuester et al. 2006 ; Giot and Laurent, 2003 ). However in project management, the P80 percentile is sometimes chosen as the most appropriate percentile to measure risk appetite (Kwon and Kang, 2019 ; Traynor and Mahmoodian, 2019 ; Lorance and Wendling, 2001 ).

Finally, after choosing the risk level we are willing to assume, we need to calculate how each risk impacts project duration ( Imp_D Ri ) and costs ( Imp_C Ri ). To do so, we subtract the original value of the total project expected duration and costs (excluding all risks) from the total duration and costs of the simulation in which we include the risk we wish to quantify (Eq. 5 ).

Finally, we present these results on two separate lists, one for the cost impact and one for the duration impact, by ranking them according to their magnitude.

In this section, we use a real-life project to illustrate how to apply the proposed method for quantitative risk prioritisation purposes. For this purpose, we choose an engineering, procurement and construction project undertaken in South America and used in the literature by Votto et al. ( 2020a , 2020b ).

Project description

The project used as an application example consists of the expansion of an industrial facility. It covers a wide spectrum of tasks, such as design and engineering work, procurement of machinery and its components, civil construction, installation of all machinery, as well as commissioning and starting up machines (Votto et al. 2020a , 2020b ).

Table 2 details the parameters that we use to define activities. The project comprises 32 activities, divided into three groups: engineering, procurement and construction (EPC). A fictitious initial activity ( Ai ) and a fictitious final activity ( Af ) are included. We employ triangular distribution functions, whose parameters are the minimum value ( Min ), the most probable value ( Mp ) and the maximum value ( Max ), to model the random duration of activities, expressed as days. We divide the cost of each activity in monetary units into a fixed cost ( FC ), independently of activity duration, and the variable cost ( VC ), which is directly proportional to project duration. As activity duration can vary, and the activity cost increases directly with its duration, the total project cost also exhibits random variations.

Under these conditions, the planned project duration is 300 days and has a planned cost of 30,000 (x1000) monetary units. Figure 4 shows the Planned Value Curve of the project.

figure 4

Planned value curve of the real-life project.

The next step in the methodology (Fig. 2 ) is to identify the project risks. To do this, the experts’ panel meets, analyses all the project documentation. Based on their personal experience with other similar projects and after consulting all the involved stakeholders, it provides a list of risks (see Table 3 ).

It identifies 11 risks, of which nine have the potential to directly impact the project duration objective (R1 to R9), while six may impact the cost objective (R10 to R15). The risks that might impact project duration and cost have two assigned codes. We identify the project phase and activity on which all the identified risks may have an impact (Table 3 ).

The next step is to estimate the likelihood and impact of the identified risks (qualitative analysis). Having analysed the project and consulted the involved stakeholders, the team determines the project’s different probability and impact levels (duration and cost). The estimation of these ranges depends on the project budget, the estimated project duration, and the team’s experience in assigning the different numerical values to each range. As a result, the project team is able to construct the probability-impact matrix shown in Fig. 5 .

figure 5

Estimation of the probability and impact ranges.

Each probability range for risk occurrence in this project is defined. Thus for a very low probability (VL), the assigned probability range is between 0 and 3% probability, for a low level (L), the assigned range lies between 3% and 10% probability of risk occurrence, and so on with the other established probability ranges (medium, high, very high).

The different impact ranges are also defined by differentiating between impacts in duration and cost terms. Thus a VL duration impact is between 0 and 5 days, while the same range (VL) in cost is between 0 and 100 (x1000) monetary units. Figure 5 shows the other ranges and their quantification in duration and cost terms.

The combination of each probability level and every impact level coincides in a cell of the risk matrix (Fig. 5 ) to indicate the risk level (“high”, “medium”, and “low”) according to the qualitative analysis. Each cell is assigned a numerical value by prioritising the risks at the same risk level. This work uses the matrix to compare the risk prioritisation results provided by this matrix to those provided by the proposed quantitative method.

A probability and impact value are assigned to each previously identified risk (Table 3 ). Thus, for example, for the risk called “Interruptions in the supply chain”, coded as R3 for impacting activity 13 duration, we estimate an L probability and a strong impact on duration (H). As this same risk might impact the activity 13 cost, it is also coded as R12, and its impact on cost is estimated as L (the probability is the same as in R3; Table 3 ).

Finally, to conclude the proposed methodology and to prioritise the identified risks, we use the “MCSimulRisk” software application by incorporating MCS (in this work, we employ 20,000 iterations in each simulation). Activities are modelled using triangular distribution functions to incorporate project information into the simulation application. Costs are modelled with fixed and variable costs depending on the duration of the corresponding activity. Furthermore, risks (probability and impact) are modelled by uniform distribution functions. Figure 6 depicts the project network and includes the identified risks that impact the corresponding activities.

figure 6

Network diagram of the project together with the identified risks.

Results and discussion

In order to obtain the results of prioritising the identified risks, we must specify a percentile that determines our risk aversion. This is the measure by which we quantify the risk. Figure 7 graphically justifies the choice of P95 as a risk measure, as opposed to a lower percentile, which corroborates the view in the literature and appears in Methodology . In Fig. 7 , we plot the probability distribution and cumulative distribution functions corresponding to the total project planned cost, together with the cost impact of one of the risks. The impact caused by the risk on the total cost corresponds to the set of iterations whose total cost is higher than that planned (bottom right of the histogram).

figure 7

Source: MCSimulRisk.

By choosing P95 as VaR, we can consider the impact of a risk on the project in the measure. In this example, for P95 we obtain a total cost value of 3.12 × 10 7 monetary units. Choosing a lower percentile, e.g. P80, means that the value we can obtain with this choice can be considerably lower (3.03 × 10 7 monetary units), and might completely ignore the impact of the risk on the total project cost. However, project managers can choose the percentile that represents their risk aversion.

Once the percentile on which to quantify the risk is chosen, the “MCSimulRisk” application provides us with the desired results for prioritising project risks (Fig. 8 ). For the chosen percentile (P95), which represents our risk appetite for this project, the planned project duration is 323.43 days. In other words, with a 95% probability the planned project will be completed before 323.43 days. Similarly, the P95 corresponding to cost is 30,339 ×1000 monetary units. The application also provides us with the project duration in the first column of Fig. 8 after incorporating all the identified risks (corresponding to a P95 risk appetite) into the planned project. Column 2 of the same figure shows the project cost after incorporating the corresponding risk into the model.

figure 8

The first column corresponds to the risks identified. Columns Duration_with_Ri and Cost_with_Ri represent the simulation values, including the corresponding risk. Columns Difference_Duration_with_Ri and Difference_Cost_with_Ri represent the difference in duration and cost of each simulation concerning the value obtained for the chosen percentile. Finally, Ranking_Dur and Ranking_Cost represent the prioritisation of risks in duration and cost, respectively.

With the results in the first two columns (total project duration and cost after incorporating the corresponding risks), and by knowing the planned total project duration and cost (without considering risks) for a given percentile (P95), we calculate the values of the following columns in Fig. 8 . Thus column 3 represents the difference between the planned total project duration value (risk-free) and project duration by incorporating the corresponding risk that we wish to quantify. Column 4 prioritises the duration risks by ranking according to the duration that each risk contributes to the project. Column 5 represents the difference between the planned total project cost (risk-free) and the total project cost by incorporating the corresponding risk. Finally, Column 6 represents the ranking or prioritisation of the project risks according to their impact on cost.

To compare the results provided by this methodology in this paper we propose quantitative risk prioritisation, based on MCS. We draw up Table 4 with the results provided by the probability-impact matrix (Fig. 5 ).

The first set of columns in Table 4 corresponds to the implementation of the risk matrix (probability-impact matrix) for the identified risks. The second group of columns represents the prioritisation of risks according to their impact on duration (data obtained from Fig. 8 ). The third group corresponds to the risk prioritisation according to their impact on cost (data obtained from Fig. 8 ).

For the project proposed as an example, we find that risk R3 is the most important one if we wish to control the total duration because it corresponds to the risk that contributes the most duration to the project if it exists. We note that risks R10 to R15 do not impact project duration. If these risks materialise, their contribution to increase (or decrease, as the case may be) project duration is nil.

On the impact on project costs, we note that risk R15 is the most important. It is noteworthy that risk R5 is the fourth most important risk in terms of impact on the total project costs, even though it is initially identified as a risk that impacts project duration. Unlike cost risks (which do not impact the total project duration), the risks that can impact project duration also impact total costs.

We can see that the order of importance of the identified risks differs depending on our chosen method (risk matrix versus quantitative prioritisation). We independently quantify each risk’s impact on the cost and duration objectives. We know not only the order of importance of risks (R3, R5, etc.) but also the magnitude of their impact on the project (which is the absolute delay caused by a risk in duration terms or what is the absolute cost overrun generated by a risk in cost terms). It seems clear that one risk is more important than another, not only because of the estimation of its probability and impact but also because the activity on which it impacts may have a high criticality index or not (probability of belonging to the project’s critical path).

As expected, the contribution to the total duration of the identified risks that impact only cost is zero. The same is not valid for the risks identified to have an impact on duration because the latter also impacts the cost objective. We also see how the risks that initially impact a duration objective are more critical for their impact on cost than others that directly impact the project’s cost (e.g. R5).

Conclusions

The probability-impact matrix is used in project management to identify the risk to which the most attention should be paid during project execution. This paper studies how the risk matrix is adopted by a large majority of standards, norms and methodologies in project management and, at the same time, practitioners and academics recognise it as a fundamental tool in the qualitative risks analysis.

However, we also study how this risk matrix presents particular problems and offers erroneous and contradictory results. Some studies suggest alternatives to its use. Notwithstanding, it continues to be a widely employed tool in the literature by practitioners and academics. Along these lines, with this work we propose an alternative to the probability-impact matrix as a tool to know the most critical risk for a project that can prevent objectives from being fulfilled.

For this purpose, we propose a quantitative method based on MCS, which provides us with numerical results of the importance of risks and their impact on total duration and cost objectives. This proposed methodology offers significant advantages over other risk prioritisation methods and tools, especially the traditional risk matrix. The proposed case study reveals that risk prioritisation yields remarkably different results depending on the selected method, as our findings confirm.

In our case, we obtain numerical values for the impact of risks on total duration and cost objectives, and independently of one another. This result is interesting for project managers because they can focus decision-making on the priority order of risks and the dominant project objective (total duration or total cost) if they do not coincide.

From the obtained results, we find that the risks with an impact on the cost of activities do not influence the total duration result. The risks that impact project duration also impact the total cost target. This impact is more significant than that of a risk that impacts only the activity’s cost. This analysis leads us to believe that this quantitative prioritisation method has incredible potential for academics to extend their research on project risks and for practitioners to use it in the day-to-day implementation of their projects.

The proposed methodology will allow project managers to discover the most relevant project risks so they can focus their control efforts on managing those risks. Usually, implementing risk response strategies might be expensive (control efforts, insurance contracts, preventive actions, or others). Therefore, it is relevant to concentrate only on the most relevant risks. The proposed methodology allows project managers to select the most critical risks by overcoming the problems exhibited by previous methodologies like the probability-impact matrix.

In addition to the above, the risk prioritisation achieved by applying the proposed methodology is based on quantifying the impacts that risks may have on the duration and cost objectives of the project. Finally, we achieve an independent risk prioritisation in duration impact and project cost impact terms. This is important because the project manager can attach more importance to one risk or other risks depending on the priority objective that predominates in the project, the schedule or the total cost.

Undoubtedly, the reliability of the proposed method depends mainly on the accuracy of estimates, which starts by identifying risks and ends with modelling the probability and impact of each risk. The methodology we propose in this paper overcomes many of the problems of previous methodologies, but still has some limitations for future research to deal with. First of all, the results of simulations depend on the estimations of variables (probability distributions and their parameters, risk aversion parameters, etc.). Methodologies for improving estimations are beyond the scope of this research; we assume project teams are sufficient experts to make rational estimationsbased on experience and previous knowledge. Secondly, as risks are assumed to be independent, the contribution or effect of a particular risk can be estimated by including it in simulation and by computing its impact on project cost and duration. This is a reasonable assumption for most projects. In some very complex projects, however, risks can be related to one another. Further research should be done to face this situation.

As an additional research line, we plan to conduct a sensitivity study by simulating many different projects to analyse the robustness of the proposed method.

Finally, it is desirable to implement this methodology in real projects and see how it responds to the reality of a project in, for example, construction, industry, or any other sector that requires a precise and differentiated risk prioritisation.

Data availability

Data will be made available on request.

Acebes F, Curto D, De Antón J, Villafáñez, F (2024) Análisis cuantitativo de riesgos utilizando “MCSimulRisk” como herramienta didáctica. Dirección y Organización , 82(Abril 2024), 87–99. https://doi.org/10.37610/dyo.v0i82.662

Acebes F, De Antón J, Villafáñez F, Poza, D (2023) A Matlab-Based Educational Tool for Quantitative Risk Analysis. In IoT and Data Science in Engineering Management (Vol. 160). Springer International Publishing. https://doi.org/10.1007/978-3-031-27915-7_8

Acebes F, Pajares J, Galán JM, López-Paredes A (2014) A new approach for project control under uncertainty. Going back to the basics. Int J Proj Manag 32(3):423–434. https://doi.org/10.1016/j.ijproman.2013.08.003

Article   Google Scholar  

Acebes F, Pereda M, Poza D, Pajares J, Galán JM (2015) Stochastic earned value analysis using Monte Carlo simulation and statistical learning techniques. Int J Proj Manag 33(7):1597–1609. https://doi.org/10.1016/j.ijproman.2015.06.012

Al-Duais FS, Al-Sharpi RS (2023) A unique Markov chain Monte Carlo method for forecasting wind power utilizing time series model. Alex Eng J 74:51–63. https://doi.org/10.1016/j.aej.2023.05.019

Ale B, Burnap P, Slater D (2015) On the origin of PCDS - (Probability consequence diagrams). Saf Sci 72:229–239. https://doi.org/10.1016/j.ssci.2014.09.003

Ali Elfarra M, Kaya M (2021) Estimation of electricity cost of wind energy using Monte Carlo simulations based on nonparametric and parametric probability density functions. Alex Eng J 60(4):3631–3640. https://doi.org/10.1016/j.aej.2021.02.027

Alleman GB, Coonce TJ, Price RA (2018a) Increasing the probability of program succes with continuous risk management. Coll Perform Manag, Meas N. 4:27–46

Google Scholar  

Alleman GB, Coonce TJ, Price RA (2018b) What is Risk? Meas N. 01(1):25–34

Ammar T, Abdel-Monem M, El-Dash K (2023) Appropriate budget contingency determination for construction projects: State-of-the-art. Alex Eng J 78:88–103. https://doi.org/10.1016/j.aej.2023.07.035

Axelos (2023) Managing Successful Projects with PRINCE2® 7th ed . (AXELOS Limited, Ed.; 7th Ed). TSO (The Stationery Office)

Bae HR, Grandhi RV, Canfield RA (2004) Epistemic uncertainty quantification techniques including evidence theory for large-scale structures. Comput Struct 82(13–14):1101–1112. https://doi.org/10.1016/j.compstruc.2004.03.014

Ball DJ, Watt J (2013) Further thoughts on the utility of risk matrices. Risk Anal 33(11):2068–2078. https://doi.org/10.1111/risa.12057

Article   PubMed   Google Scholar  

Caron F (2013) Quantitative analysis of project risks. In Managing the Continuum: Certainty, Uncertainty, Unpredictability in Large Engineering Projects (Issue 9788847052437, pp. 75–80). Springer, Milano. https://doi.org/10.1007/978-88-470-5244-4_14

Caron F, Fumagalli M, Rigamonti A (2007) Engineering and contracting projects: A value at risk based approach to portfolio balancing. Int J Proj Manag 25(6):569–578. https://doi.org/10.1016/j.ijproman.2007.01.016

Chapman CB (1997) Project risk analysis and management– PRAM the generic process. Int J Proj Manag 15(5):273–281. https://doi.org/10.1016/S0263-7863(96)00079-8

Chapman CB, Ward S (2003) Project Risk Management: Processes, Techniques and Insights (John Wiley and Sons, Ed.; 2nd ed.). Chichester

Chen P-H, Peng T-T (2018) Value-at-risk model analysis of Taiwanese high-tech facility construction. J Manag Eng, 34 (2). https://doi.org/10.1061/(asce)me.1943-5479.0000585

Cox LA (2008) What’s wrong with risk matrices? Risk Anal 28(2):497–512. https://doi.org/10.1111/j.1539-6924.2008.01030.x

Cox LA, Babayev D, Huber W (2005) Some limitations of qualitative risk rating systems. Risk Anal 25(3):651–662. https://doi.org/10.1111/j.1539-6924.2005.00615.x

Creemers S, Demeulemeester E, Van de Vonder S (2014) A new approach for quantitative risk analysis. Ann Oper Res 213(1):27–65. https://doi.org/10.1007/s10479-013-1355-y

Article   MathSciNet   Google Scholar  

Curto D, Acebes F, González-Varona JM, Poza D (2022) Impact of aleatoric, stochastic and epistemic uncertainties on project cost contingency reserves. Int J Prod Econ 253(Nov):108626. https://doi.org/10.1016/j.ijpe.2022.108626

Damnjanovic I, Reinschmidt KF (2020) Data Analytics for Engineering and Construction Project Risk Management . Springer International Publishing

Duijm NJ (2015) Recommendations on the use and design of risk matrices. Saf Sci 76:21–31. https://doi.org/10.1016/j.ssci.2015.02.014

Eldosouky IA, Ibrahim AH, Mohammed HED (2014) Management of construction cost contingency covering upside and downside risks. Alex Eng J 53(4):863–881. https://doi.org/10.1016/j.aej.2014.09.008

Elms DG (2004) Structural safety: Issues and progress. Prog Struct Eng Mater 6:116–126. https://doi.org/10.1002/pse.176

European Commission. (2023) Project Management Methodology. Guide 3.1 (European Union, Ed.). Publications Office of the European Union

Frank M (1999) Treatment of uncertainties in space nuclear risk assessment with examples from Cassini mission implications. Reliab Eng Syst Safe 66:203–221. https://doi.org/10.1016/S0951-8320(99)00002-2

Gatti S, Rigamonti A, Saita F, Senati M (2007) Measuring value-at-risk in project finance transactions. Eur Financ Manag 13(1):135–158. https://doi.org/10.1111/j.1468-036X.2006.00288.x

Giot P, Laurent S (2003) Market risk in commodity markets: a VaR approach. Energy Econ 25:435–457. https://doi.org/10.1016/S0140-9883(03)00052-5

Goerlandt F, Reniers G (2016) On the assessment of uncertainty in risk diagrams. Saf Sci 84:67–77. https://doi.org/10.1016/j.ssci.2015.12.001

Helton JC, Johnson JD, Oberkampf WL, Sallaberry CJ (2006) Sensitivity analysis in conjunction with evidence theory representations of epistemic uncertainty. Reliab Eng Syst Saf 91(10–11):1414–1434. https://doi.org/10.1016/j.ress.2005.11.055

Hillson D (2014) How to manage the risks you didn’t know you were taking. Paper presented at PMI® Global Congress 2014—North America, Phoenix, AZ. Newtown Square, PA: Project Management Institute

Hillson D, Simon P (2020) Practical Project Risk Management. THE ATOM METHODOLOGY (Third Edit, Issue 1). Berrett-Koehler Publishers, Inc

Hulett DT (2012) Acumen Risk For Schedule Risk Analysis - A User’s Perspective . White Paper. https://info.deltek.com/acumen-risk-for-schedule-risk-analysis

International Organization for Standardization. (2018). ISO 31000:2018 Risk management – Guidelines (Vol. 2)

International Organization for Standardization. (2019). ISO/IEC 31010:2019 Risk management - Risk assessment techniques

International Project Management Association. (2015). Individual Competence Baseline for Project, Programme & Portfolio Management. Version 4.0. In International Project Management Association (Vol. 4). https://doi.org/10.1002/ejoc.201200111

Joukar A, Nahmens I (2016) Estimation of the Escalation Factor in Construction Projects Using Value at Risk. Construction Research Congress , 2351–2359. https://doi.org/10.1061/9780784479827.234

Kerzner H (2022) Project Management. A Systems Approach to Planning, Scheduling, and Controlling (Inc. John Wiley & Sons, Ed.; 13th Editi)

Koulinas GK, Demesouka OE, Sidas KA, Koulouriotis DE (2021) A topsis—risk matrix and Monte Carlo expert system for risk assessment in engineering projects. Sustainability 13(20):1–14. https://doi.org/10.3390/su132011277

Krisper M (2021) Problems with Risk Matrices Using Ordinal Scales . https://doi.org/10.48550/arXiv.2103.05440

Kuester K, Mittnik S, Paolella MS (2006) Value-at-risk prediction: A comparison of alternative strategies. J Financ Econ 4(1):53–89. https://doi.org/10.1093/jjfinec/nbj002

Kwon H, Kang CW (2019) Improving project budget estimation accuracy and precision by analyzing reserves for both identified and unidentified risks. Proj Manag J 50(1):86–100. https://doi.org/10.1177/8756972818810963

Lemmens SMP, Lopes van Balen VA, Röselaers YCM, Scheepers HCJ, Spaanderman MEA (2022) The risk matrix approach: a helpful tool weighing probability and impact when deciding on preventive and diagnostic interventions. BMC Health Serv Res 22(1):1–11. https://doi.org/10.1186/s12913-022-07484-7

Levine ES (2012) Improving risk matrices: The advantages of logarithmically scaled axes. J Risk Res 15(2):209–222. https://doi.org/10.1080/13669877.2011.634514

Article   ADS   Google Scholar  

Li J, Bao C, Wu D (2018) How to design rating schemes of risk matrices: a sequential updating approach. Risk Anal 38(1):99–117. https://doi.org/10.1111/risa.12810

Lorance RB, Wendling RV (2001) Basic techniques for analyzing and presentation of cost risk analysis. Cost Eng 43(6):25–31

Markowski AS, Mannan MS (2008) Fuzzy risk matrix. J Hazard Mater 159(1):152–157. https://doi.org/10.1016/j.jhazmat.2008.03.055

Article   CAS   PubMed   Google Scholar  

Menge DNL, MacPherson AC, Bytnerowicz TA et al. (2018) Logarithmic scales in ecological data presentation may cause misinterpretation. Nat Ecol Evol 2:1393–1402. https://doi.org/10.1038/s41559-018-0610-7

Monat JP, Doremus S (2020) An improved alternative to heat map risk matrices for project risk prioritization. J Mod Proj Manag 7(4):214–228. https://doi.org/10.19255/JMPM02210

Naderpour H, Kheyroddin A, Mortazavi S (2019) Risk assessment in bridge construction projects in Iran using Monte Carlo simulation technique. Pract Period Struct Des Constr 24(4):1–11. https://doi.org/10.1061/(asce)sc.1943-5576.0000450

Ni H, Chen A, Chen N (2010) Some extensions on risk matrix approach. Saf Sci 48(10):1269–1278. https://doi.org/10.1016/j.ssci.2010.04.005

Peace C (2017) The risk matrix: Uncertain results? Policy Pract Health Saf 15(2):131–144. https://doi.org/10.1080/14773996.2017.1348571

Project Management Institute. (2009) Practice Standard for Project Risk Management . Project Management Institute, Inc

Project Management Institute. (2017) A Guide to the Project Management Body of Knowledge: PMBoK(R) Guide. Sixth Edition (6th ed.). Project Management Institute Inc

Project Management Institute. (2019) The standard for Risk Management in Portfolios, Programs and Projects . Project Management Institute, Inc

Project Management Institute. (2021) A Guide to the Project Management Body of Knowledge: PMBoK(R) Guide. Seventh Edition (7th ed.). Project Management Institute, Inc

Proto R, Recchia G, Dryhurst S, Freeman ALJ (2023) Do colored cells in risk matrices affect decision-making and risk perception? Insights from randomized controlled studies. Risk Analysis , 1–15. https://doi.org/10.1111/risa.14091

Qazi A, Dikmen I (2021) From risk matrices to risk networks in construction projects. IEEE Trans Eng Manag 68(5):1449–1460. https://doi.org/10.1109/TEM.2019.2907787

Qazi A, Shamayleh A, El-Sayegh S, Formaneck S (2021) Prioritizing risks in sustainable construction projects using a risk matrix-based Monte Carlo Simulation approach. Sustain Cities Soc 65(Aug):102576. https://doi.org/10.1016/j.scs.2020.102576

Qazi A, Simsekler MCE (2021) Risk assessment of construction projects using Monte Carlo simulation. Int J Manag Proj Bus 14(5):1202–1218. https://doi.org/10.1108/IJMPB-03-2020-0097

Rehacek P (2017) Risk management standards for project management. Int J Adv Appl Sci 4(6):1–13. https://doi.org/10.21833/ijaas.2017.06.001

Rezaei F, Najafi AA, Ramezanian R (2020) Mean-conditional value at risk model for the stochastic project scheduling problem. Comput Ind Eng 142(Jul):106356. https://doi.org/10.1016/j.cie.2020.106356

Ruan X, Yin Z, Frangopol DM (2015) Risk Matrix integrating risk attitudes based on utility theory. Risk Anal 35(8):1437–1447. https://doi.org/10.1111/risa.12400

Sarykalin S, Serraino G, Uryasev S (2008) Value-at-risk vs. conditional value-at-risk in risk management and optimization. State-of-the-Art Decision-Making Tools in the Information-Intensive Age, October 2023 , 270–294. https://doi.org/10.1287/educ.1080.0052

Simon P, Hillson D, Newland K (1997) PRAM Project Risk Analysis and Management Guide (P. Simon, D. Hillson, & K. Newland, Eds.). Association for Project Management

Sutherland H, Recchia G, Dryhurst S, Freeman ALJ (2022) How people understand risk matrices, and how matrix design can improve their use: findings from randomized controlled studies. Risk Anal 42(5):1023–1041. https://doi.org/10.1111/risa.13822

Talbot, J (2014). What’s right with risk matrices? An great tool for risk managers… 31000risk. https://31000risk.wordpress.com/article/what-s-right-with-risk-matrices-3dksezemjiq54-4/

Taroun A (2014) Towards a better modelling and assessment of construction risk: Insights from a literature review. Int J Proj Manag 32(1):101–115. https://doi.org/10.1016/j.ijproman.2013.03.004

The Standish Group. (2022). Chaos report . https://standishgroup.myshopify.com/collections/all

Thomas P, Bratvold RB, Bickel JE (2014) The risk of using risk matrices. SPE Econ Manag 6(2):56–66. https://doi.org/10.2118/166269-pa

Tong R, Cheng M, Zhang L, Liu M, Yang X, Li X, Yin W (2018) The construction dust-induced occupational health risk using Monte-Carlo simulation. J Clean Prod 184:598–608. https://doi.org/10.1016/j.jclepro.2018.02.286

Traynor BA, Mahmoodian M (2019) Time and cost contingency management using Monte Carlo simulation. Aust J Civ Eng 17(1):11–18. https://doi.org/10.1080/14488353.2019.1606499

Vanhoucke, M (2018). The data-driven project manager: A statistical battle against project obstacles. In The Data-Driven Project Manager: A Statistical Battle Against Project Obstacles . https://doi.org/10.1007/978-1-4842-3498-3

Vatanpour S, Hrudey SE, Dinu I (2015) Can public health risk assessment using risk matrices be misleading? Int J Environ Res Public Health 12(8):9575–9588. https://doi.org/10.3390/ijerph120809575

Article   CAS   PubMed   PubMed Central   Google Scholar  

Vose, D (2008). Risk Analysis: a Quantitative Guide (3rd ed.) . Wiley

Votto R, Lee Ho L, Berssaneti F (2020a) Applying and assessing performance of earned duration management control charts for EPC project duration monitoring. J Constr Eng Manag 146(3):1–13. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001765

Votto R, Lee Ho L, Berssaneti F (2020b) Multivariate control charts using earned value and earned duration management observations to monitor project performance. Comput Ind Eng 148(Sept):106691. https://doi.org/10.1016/j.cie.2020.106691

Ward S (1999) Assessing and managing important risks. Int J Proj Manag 17(6):331–336. https://doi.org/10.1016/S0263-7863(98)00051-9

Download references

Acknowledgements

This research has been partially funded by the Regional Government of Castile and Leon (Spain) and the European Regional Development Fund (ERDF, FEDER) with grant VA180P20.

Author information

Authors and affiliations.

GIR INSISOC. Dpto. de Organización de Empresas y CIM. Escuela de Ingenierías Industriales, Universidad de Valladolid, Pº Prado de la Magdalena s/n, 47011, Valladolid, Spain

F. Acebes & J. Pajares

GIR INSISOC. Dpto. Economía y Administración de Empresas, Universidad de Málaga, Avda. Cervantes, 2, 29071, Málaga, Spain

J. M. González-Varona & A. López-Paredes

You can also search for this author in PubMed   Google Scholar

Contributions

FA developed the conceptualisation and the methodology. JMG contributed to the literature review and interpretations of the results for the manuscript. FA and JP collected the experimental data and developed all the analyses and simulations. AL supervised the project. FA and JP wrote the original draft, while AL and JMG conducted the review and editing. All authors have read and agreed to the published version of the manuscript.

Corresponding author

Correspondence to F. Acebes .

Ethics declarations

Competing interests.

The authors declare no competing interests.

Ethical approval

Ethical approval was not required as the study did not involve human participants.

Informed consent

No human subjects are involved in this study.

Additional information

Publisher’s note Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Supplementary information

Rights and permissions.

Open Access This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made. The images or other third party material in this article are included in the article’s Creative Commons licence, unless indicated otherwise in a credit line to the material. If material is not included in the article’s Creative Commons licence and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this licence, visit http://creativecommons.org/licenses/by/4.0/ .

Reprints and permissions

About this article

Cite this article.

Acebes, F., González-Varona, J.M., López-Paredes, A. et al. Beyond probability-impact matrices in project risk management: A quantitative methodology for risk prioritisation. Humanit Soc Sci Commun 11 , 670 (2024). https://doi.org/10.1057/s41599-024-03180-5

Download citation

Received : 30 January 2024

Accepted : 13 May 2024

Published : 24 May 2024

DOI : https://doi.org/10.1057/s41599-024-03180-5

Share this article

Anyone you share the following link with will be able to read this content:

Sorry, a shareable link is not currently available for this article.

Provided by the Springer Nature SharedIt content-sharing initiative

Quick links

  • Explore articles by subject
  • Guide to authors
  • Editorial policies

risk management in project management research paper

Project Risk Management Methodology

  • Conference paper
  • First Online: 03 January 2020
  • Cite this conference paper

risk management in project management research paper

  • Anastasia Romanskaya 17 &
  • Anatoliy Berdnikov 17  

Part of the book series: Advances in Intelligent Systems and Computing ((AISC,volume 1113))

912 Accesses

The proposed methodology can be used to more accurately analyze and predict project results. The methodology is based on the interaction of the method of evaluating the project’s timing and budget - PERT and the method of constructing a multivariate forecast of the dynamics of the external environment - the decision tree. The combination of these methods excludes their shortcomings separately. Thus, the proposed methodology visualizes the development of the project in a graphic way and includes a probabilistic assessment of the project scenarios. The relevance of the work is due to the fact that many projects are currently being implemented in various spheres of human life, but not all projects achieve their goals, including IT projects. According to The Standish Group, around the world last year $ 750 billion was spent on software development and implementation projects, and only 36% of projects were completed successfully, while 48% were only partially successful, i.e. went beyond budget or on time, and the remaining 16% failed. As a result, $ 120 billion was spent on failed projects of $ 750 billion.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Subscribe and save.

  • Get 10 units per month
  • Download Article/Chapter or eBook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
  • Available as EPUB and PDF
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Similar content being viewed by others

risk management in project management research paper

The Comparison of Selected Risk Management Methods for Project Management

risk management in project management research paper

Estimating Risk Management in Software Engineering Projects

risk management in project management research paper

A Reassessment of Risk Management in Software Projects

Kachalov, R.M.: Management of economic risk: theoretical foundations and applications: monograph. Nestor-Istoriya, St. Petersburg, 248 p. (2012)

Google Scholar  

Risk analysis of an investment project. Risk Management, no. 3. pp. 18–20 (2002)

Chernov, V.B.: Risk analysis of an integrated investment project. Risk Management, no. 3. pp. 56–64 (2003)

Smolyak, S.A.: Assessment of the effectiveness of investment projects in conditions of risk and uncertainty. Theory of the Expected Effect, Nauka, 182 p. (2002)

Lepeshkina, M.N.: Methodological aspects of risk assessment. Management in Russia and Abroad, no. 6, pp. 88–98 (2001)

Sorokina, O.V.: Simulation modeling as a method of optimizing investment risks. In: Traditions, Innovations and Investments of a Modern Market Economy: Materials International Conference on Kazan, Part 2, pp. 351–355. Academy of Management “TISBI”, Kazan (2004)

Sekerin, A.B., Selyutin, V.D., Stroyev, S.P.: A fuzzy-plural model for managing the risk of economic insolvency of a manufacturing enterprise. Risk Management, no. 2, pp. 28–35 (2008)

Studenikina, S.A., Zaslavskaya, S.E.: The use of mathematical models in risk management. Modern problems of textile and light industry: abstracts of the Interuniversity. Scientific Conference Part 2, RosZITLP, 160 p. (2004)

Download references

Author information

Authors and affiliations.

CSD, V. N. Karazin Kharkiv National University, Kharkiv, Ukraine

Anastasia Romanskaya & Anatoliy Berdnikov

You can also search for this author in PubMed   Google Scholar

Corresponding author

Correspondence to Anastasia Romanskaya .

Editor information

Editors and affiliations.

National Aerospace University "Kharkiv Aviation Institute", Kharkov, Ukraine

Mykola Nechyporuk

Vladimir Pavlikov

Dmitriy Kritskiy

Rights and permissions

Reprints and permissions

Copyright information

© 2020 Springer Nature Switzerland AG

About this paper

Cite this paper.

Romanskaya, A., Berdnikov, A. (2020). Project Risk Management Methodology. In: Nechyporuk, M., Pavlikov, V., Kritskiy, D. (eds) Integrated Computer Technologies in Mechanical Engineering. Advances in Intelligent Systems and Computing, vol 1113. Springer, Cham. https://doi.org/10.1007/978-3-030-37618-5_36

Download citation

DOI : https://doi.org/10.1007/978-3-030-37618-5_36

Published : 03 January 2020

Publisher Name : Springer, Cham

Print ISBN : 978-3-030-37617-8

Online ISBN : 978-3-030-37618-5

eBook Packages : Engineering Engineering (R0)

Share this paper

Anyone you share the following link with will be able to read this content:

Sorry, a shareable link is not currently available for this article.

Provided by the Springer Nature SharedIt content-sharing initiative

  • Publish with us

Policies and ethics

  • Find a journal
  • Track your research

risk management in project management research paper

Academia.edu no longer supports Internet Explorer.

To browse Academia.edu and the wider internet faster and more securely, please take a few seconds to  upgrade your browser .

  •  We're Hiring!
  •  Help Center

Project Risk Management

  • Most Cited Papers
  • Most Downloaded Papers
  • Newest Papers
  • Last »
  • Project Management Follow Following
  • Construction Project Management Follow Following
  • Risk Management Follow Following
  • Construction Management Follow Following
  • COST ESTIMATION IN PROJECT MANAGEMENT Follow Following
  • CAUSES OF DELAYS AND COST OVERRUNS OF CONTRUCTION PROJECTS Follow Following
  • Business Process Management Follow Following
  • Quantity Surveying Follow Following
  • Procurement Follow Following
  • Risk management and control of ERP projects Follow Following

Enter the email address you signed up with and we'll email you a reset link.

  • Academia.edu Journals
  •   We're Hiring!
  •   Help Center
  • Find new research papers in:
  • Health Sciences
  • Earth Sciences
  • Cognitive Science
  • Mathematics
  • Computer Science
  • Academia ©2024

8 Common Project Management Risks and their Solutions

  • October 7, 2024
  • in Project Management

Are you ready to explore and defeat various types of risks in project management? Success in today’s ever-changing business environment depends critically on comprehending the subtleties of project risks. Project management has many challenges, ranging from scope creep to resource constraints.

This article explores the essential elements of recognizing and controlling risks in projects. It also examines the different risks that might compromise your project’s success and offers practical ways to manage risks and reduce uncertainty. Let us inspire you on your project optimization and risk management to achieve outstanding success.

What are Project Management Risks?

In project management, “risk” refers to unforeseen circumstances or events that could affect the project’s goals .

These risks may hamper project progress, manifesting as delays, cost overruns, or poor quality outcomes. Risks, by their very nature, add unpredictability and variability to project outcomes, which may fail or be less than ideal.

Identifying, analyzing, and mitigating these possible risks are all necessary for effective risk management to guarantee project success and reduce unfavorable effects.

Mastering 8 Key Project Management Risks

Discover eight project management risks that may impact project success and gain actionable strategies to minimize these challenges and guarantee optimal project outcomes. Let’s navigate these risks together.

1. Scope Creep

Implementing strict change control protocols and conducting frequent scope reviews will help you prevent scope creep. Set project boundaries up front to prevent requirements from growing over time and guarantee that the project aligns with goals.

To effectively manage this risk, you must prioritize requirements, set realistic project goals, and engage in proactive scope management throughout the project lifecycle.

2. Resource Constraints

Efficient resource planning and allocation techniques are crucial for addressing resource constraints. Complete resource assessments and resource management tools are necessary to master this risk. To maximize project efficiency and optimize the use of assets, team members must collaborate effectively .

Furthermore, proactive resource availability monitoring and flexible resource allocation can lessen the harmful effects of limitations on project deliverables and timelines.

3. Technical Complexity

Managing technical complexity requires using subject matter experts, conducting in-depth risk assessments, and implementing the right technologies and procedures . You should deconstruct complex tasks into smaller, more manageable parts to handle this risk successfully.

Clearly define the technical requirements, including the tech stack for your projects ,  and monitor and respond to technical issues throughout the project. Collaboration and regular communication among team members can also aid in successfully navigating technical complexity.

4. Dependencies

Recognizing and recording all project dependencies early in the planning stage is critical to minimizing them. Implementing trustworthy management practices and describing specific dependency relationships are necessary to master this risk.

Additionally, strong relationships with external stakeholders and the development of backup plans can help lessen the harmful effects of dependencies on project deliverables and timelines.

5. Communication Breakdowns

To prevent communication breakdowns, transparent communication channels, outlining roles and duties, and encouraging an open communication culture within the project team are necessary.

To handle this risk successfully, it is necessary to plan regular status meetings with brief project updates . Therefore, paying close attention to stakeholders’ opinions and concerns is imperative to guarantee alignment and quickly solve potential issues.

Communication tools and strategies, such as collaboration platforms and project dashboard s, and using AI tools for project management can guarantee successful interaction and connection among all project stakeholders.

6. Budget Overruns

Using exacting cost estimation methods, keeping a careful eye on project costs, and proactively handling modifications to the project’s budget are all necessary for managing budget overruns. Establishing a thorough budget plan , carrying out frequent expenditure reviews , and spotting chances to cut costs throughout the project lifecycle is vital for handling project management risks.

Moreover, open and honest communication with stakeholders regarding financial limitations and possible hazards can lessen the adverse effects of budget overruns on project results.

Additionally, leveraging invoicing software can streamline the financial management process by automating invoicing, tracking expenses, and providing real-time insights into project finances, helping to prevent and mitigate budget overruns.

7. Schedule Slippage

Developing realistic project schedules, identifying potential risks, and implementing proactive schedule management strategies are essential to managing schedule slippage.

Manage this project management risk by regularly tracking project progress and performing profound schedule assessments . Modify the project schedule as necessary to enable changes, reduce delays, and ensure successful delivery.

In addition, building buffer time into the schedule and fostering a culture of accountability and responsiveness among team members can help minimize the impact of schedule slippages on project timelines.

8. Quality Compromises

Set clear standards and prioritize quality control tasks to avoid lower standards. Encourage team members to take responsibility for standards during the project lifecycle for optimal project results.

Problems can be resolved early on by conducting frequent quality audits while offering team members continual training and support. Effective quality control processes guarantee high standards are maintained throughout the project lifecycle.

Furthermore, sustaining a culture of continuous process improvement and customer focus can help confirm that project deliverables meet or exceed stakeholder expectations.

How to Deal with Project Management Risks?

Effective risk management is an integral part of successful project delivery. Check several methods for recognizing, reducing, and monitoring project management risks to boost project results and minimize possible disruption.

1. Risk Identification and Assessment

Hold in-depth risk identification sessions with essential stakeholders to find possible risks in all project phases.

Risk assessment tools and techniques, such as probability , impact assessments , and risk matrices , prioritize risks according to likelihood and impact.

In the project lifecycle, periodically review and update the risk register to identify new risks and reevaluate current ones, thus guaranteeing proactive risk management.

2. Risk Mitigation and Contingency Planning

Create proactive measures for each identified risk , focusing on reducing its impact and probability as part of the project contingency plan.

Create backup plans that include predetermined actions and escalation protocols for high-priority risks that are not wholly minimized.

Set aside resources to put prevention plans and strategies into action so that you’re ready to deal with unexpected circumstances as they come up.

3. Stakeholders Engagement and Communication

Encourage project stakeholders to communicate openly and honestly and to voice any worries or observations about project risks.

Involve stakeholders in risk response planning and decision-making phases to guarantee alignment and support for risk management techniques.

Regularly update stakeholders on risk status through the employee intranet to promote transparency and trust in project management.

4. Continuous Monitoring and Review

Set up effective monitoring systems to monitor the status of identified dangers, including indicators and triggers that could indicate an increase in risk.

Review and evaluate risks regularly to determine the effectiveness of backup plans and preventive measures and adjust your approach as needed.

By documenting the lessons discovered from risk events and incorporating them into the planning and execution of future projects, you can promote a culture of continuous improvement.

What is Risk Management and How to Use it?

Risk management is the systematic process of identifying, evaluating, minimizing, and monitoring risks to reduce their impact on project objectives.

Comidor’s project management software can help optimize risk management procedures by centralizing risk registers, enabling real-time team collaboration, and offering risk assessment and analysis tools. Effective risk management requires regular risk assessment, prioritizing high-impact risks, and proactive planning of responses. Using technology to automate and expedite risk management tasks increases the effectiveness of handling possible challenges. Implementing robust risk management procedures can maximize project success and improve your business’s resilience.

Recognizing and managing project risks is critical to the success of any project. Proactive risk management techniques can reduce interruptions. Tools can guarantee efficient project delivery and maximize project outcomes. Remember that risk prevention and early identification are vital. Be prepared to uncover potential project risks early and take decisive action to validate the success of your project.

  • manage risk
  • project management
  • project management software
  • project progress management
  • risk management

What is a Document Management Workflow?

Privacy overview.

risk management in project management research paper

REQUEST A DEMO

START FOR FREE

Information

  • Author Services

Initiatives

You are accessing a machine-readable page. In order to be human-readable, please install an RSS reader.

All articles published by MDPI are made immediately available worldwide under an open access license. No special permission is required to reuse all or part of the article published by MDPI, including figures and tables. For articles published under an open access Creative Common CC BY license, any part of the article may be reused without permission provided that the original article is clearly cited. For more information, please refer to https://www.mdpi.com/openaccess .

Feature papers represent the most advanced research with significant potential for high impact in the field. A Feature Paper should be a substantial original Article that involves several techniques or approaches, provides an outlook for future research directions and describes possible research applications.

Feature papers are submitted upon individual invitation or recommendation by the scientific editors and must receive positive feedback from the reviewers.

Editor’s Choice articles are based on recommendations by the scientific editors of MDPI journals from around the world. Editors select a small number of articles recently published in the journal that they believe will be particularly interesting to readers, or important in the respective research area. The aim is to provide a snapshot of some of the most exciting work published in the various research areas of the journal.

Original Submission Date Received: .

  • Active Journals
  • Find a Journal
  • Journal Proposal
  • Proceedings Series
  • For Authors
  • For Reviewers
  • For Editors
  • For Librarians
  • For Publishers
  • For Societies
  • For Conference Organizers
  • Open Access Policy
  • Institutional Open Access Program
  • Special Issues Guidelines
  • Editorial Process
  • Research and Publication Ethics
  • Article Processing Charges
  • Testimonials
  • Preprints.org
  • SciProfiles
  • Encyclopedia

applsci-logo

Article Menu

risk management in project management research paper

  • Subscribe SciFeed
  • Recommended Articles
  • Google Scholar
  • on Google Scholar
  • Table of Contents

Find support for a specific problem in the support section of our website.

Please let us know what you think of our products and services.

Visit our dedicated information section to learn more about MDPI.

JSmol Viewer

Analytical hierarchy process for construction safety management and resource allocation.

risk management in project management research paper

1. Introduction

1.1. research objective, 1.2. research contribution, 2. background, 2.1. the 5m model, 2.1.1. medium, 2.1.2. mission, 2.1.4. machinery, 2.1.5. management, 2.2. the ahp model, 3. research methodology.

  • The first alternative (A) suggests optimizing the safety budget to an optimal ratio of 1% of the project scope, as advocated by Shohet et al. [ 34 ]. It should be emphasized that this ratio is suitable for large construction projects and that in other types of projects (e.g., Small and Medium Enterprises’ (SMEs) projects), the optimal ratio may be up to four times higher (3.8%) [ 7 ].
  • The second alternative (B) suggests allocating a modest safety budget of 0.5% and using technological mitigation activities to enhance project safety with the extra 0.5%, eventually allowing an exception of d% from the optimal safety budget of 1% suggested in A. That means a total safety budget of (1 + d)%.
  • The third alternative (C) suggests allocating a modest safety budget of 0.5% and sticking to it without any additional safety resource allocation.
  • AHP Test 1: High priority to safety risk—20% for cost and 80% for risk.
  • AHP Test 2: High priority to safety cost—80% for cost and 20% for risk.
  • AHP Test 3: No criteria are prioritized—50% for cost and 50% for risk.

4. Results and Discussion

4.1. case study 1—cost analysis.

  • T P B = t o t a l   p r o j e c t   b u d g e t
  • T P B W S B = t o t a l   p r o j e c t   b u d g e t   w i t h o u t   s a f e t y   b u d g e t
  • p s a f e t y = s a f e t y   b u d g e t   i n   p e r c e n t a g e   o f   t o t a l   p r o j e c t   b u d g e t
  • S B = s a f e t y   b u d g e t

4.1.1. Case Study 1—Alternative A

4.1.2. case study 1—alternative b.

  • The estimated duration of the structural works is 6 months. ◦ The cost of a safety inspector in a 50% position scope in addition to the existing professional team on site—USD 15,142; ◦ An extra worker for directing concrete trucks for an estimated duration of 20 min in casting—USD 3114; ◦ Three body cameras (one for the workers’ team, one for the foreman, and one for the pump operator)—USD 870; ◦ A drone for two workdays for each (total cost for worker + drone)—USD 5063.
  • The estimated duration of the finishing and developing works is 13 months. ◦ The cost of a safety inspector in a 25% position scope in addition to the existing professional team on site—USD 13,880; ◦ Three body cameras (one for the workers’ team, one for the foreman, and one for the lifting machine)—USD 1344; ◦ The cost of an upgrade to a European scaffold—after a cost reduction of the scaffold in a total front area of 4662 m 2 —USD 12,392.

4.1.3. Case Study 1—Alternative C

4.1.4. case study 1—ahp for decision-making, 4.1.5. case study 1—consistency test, 4.1.6. case study 1—ahp test 1: high priority to safety risk, 4.1.7. case study 1—ahp test 2: high priority to safety cost, 4.1.8. case study 1—ahp test 3: no criteria are prioritized, 4.1.9. case study 1—discussion.

  • Alternative B will be preferred when the contractor wishes to avoid risk as much as possible (the risk weight is high—risk aversion contractor).
  • Alternative C will be preferred when the contractor wishes to save expenses (the cost weight is high).
  • Alternative A will be preferred when the weights of risks and costs are equal—what goes along with the optimal investment model.

4.1.10. Case Study 1—Worker’s Questionnaire

4.2. case study 2, 4.2.1. case study 2—cost analysis and alternatives.

  • Alternative A considers allocating an optimal safety investment ratio that is 1% of the total project cost. The cost to the owner, including safety investment according to alternative A, is therefore USD 11,110,000.
  • Alternative B considers allocating an initial safety investment ratio that is 0.5% of the total project cost. The cost to the owner, including initial safety investment according to alternative B, is therefore USD 11,055,000. Considering the optimal safety investment ratio of 1%, an upgraded safety investment is possible with the extra 0.5% available safety budget. However, due to the large number of accidents that occurred at the site, the safety budget was upgraded to a total safety budget of USD 200,000. This results in a supplement of the safety budget of USD 90,000 but without applying any advanced technological solutions. Allocating a supplement of USD 90,000 to the safety budget leads to a total safety budget of 1.8%.
  • Alternative C considers allocating a modest safety investment ratio that is 0.5% of the total project cost. The cost to the owner, including initial safety investment according to alternative B, is therefore USD 11,055,000.

4.2.2. Case Study 2—AHP for Decision-Making

4.2.3. case study 2—ahp test 1: high priority to safety risk, 4.2.4. case study 2—ahp test 2: high priority to safety cost, 4.2.5. case study 2—ahp test 3: no criteria are prioritized, 4.2.6. case study 2—discussion.

  • Alternative B will NOT be preferred when the contractor wishes to avoid risk as much as possible due to the high number of accidents at the project site but without the use of technological solutions. Instead, alternative A is selected.
  • Alternative A will be preferred when the weights of risks and costs are equal—which goes along with the optimal investment model.

5. Conclusions

Author contributions, institutional review board statement, informed consent statement, data availability statement, conflicts of interest.

  • Helander, M.G. Safety hazards and motivation for safe work in the construction industry. Int. J. Ind. Ergon. 1991 , 8 , 205–223. [ Google Scholar ] [ CrossRef ]
  • Sanni-Anibire, M.O.; Mahmoud, A.S.; Hassanain, M.A.; Salami, B.A. A risk assessment approach for enhancing construction safety performance. Saf. Sci. 2020 , 121 , 15–29. [ Google Scholar ] [ CrossRef ]
  • Halabi, Y.; Xu, H.; Long, D.; Chen, Y.; Yu, Z.; Alhaek, F.; Alhaddad, W. Causal factors and risk assessment of fall accidents in the U.S. construction industry: A comprehensive data analysis (2000–2020). Saf. Sci. 2022 , 146 , 105537. [ Google Scholar ] [ CrossRef ]
  • Miller, C.O. Investigating the management factors in an airline accident. Flight Saf. Dig. 1991 , 10 , 1–15. [ Google Scholar ]
  • Li, W.; Zhang, L.; Liang, W. An Accident Causation Analysis and Taxonomy (ACAT) model of complex industrial system from both system safety and control theory perspectives. Saf. Sci. 2017 , 92 , 94–103. [ Google Scholar ] [ CrossRef ]
  • Harris, D. The influence of human factors on operational efficiency. Aircr. Eng. Aerosp. Technol. 2006 , 78 , 20–25. [ Google Scholar ] [ CrossRef ]
  • Kima, O.; Urlainis, A.; Wang, K.-C.; Shohet, I.M. Safety climate in small and medium construction enterprises. Smart Sustain. Built Environ. 2024; ahead-of-print . [ Google Scholar ] [ CrossRef ]
  • Shohet, I.M.; Wei, H.-H.; Skibniewski, M.J.; Tak, B.; Revivi, M. Integrated Communication, Control, and Command of Construction Safety and Quality. J. Constr. Eng. Manag. 2019 , 145 , 04019051. [ Google Scholar ] [ CrossRef ]
  • Bachar, R.; Urlainis, A.; Wang, K.-C.; Shohet, I. Optimal allocation of safety resources in small and medium construction enterprises. Saf. Sci. 2025 , 181 , 106680. [ Google Scholar ] [ CrossRef ]
  • Cheng, E.W.; Li, H. Information priority-setting for better resource allocation using analytic hierarchy process (AHP). Inf. Manag. Comput. Secur. 2001 , 9 , 61–70. [ Google Scholar ] [ CrossRef ]
  • Heinrich, H.W. Industrial Accident Prevention: A Scientific Approach , 4th ed.; Safety Management; Mcgraw-Hill Book Company: New York, NY, USA, 1959. [ Google Scholar ]
  • Arifin, K.; Ahmad, M.A.; Abas, A.; Juhari, M.L.; Ali, M.X.M.; Fadzil, L.M. Identification of root cause of fatal confined space incidents in Malaysia and strategies for prevention. Discov. Sustain. 2024 , 5 , 36. [ Google Scholar ] [ CrossRef ]
  • Choe, S.; Leite, F. Assessing Safety Risk among Different Construction Trades: Quantitative Approach. J. Constr. Eng. Manag. 2017 , 143 , 04016133. [ Google Scholar ] [ CrossRef ]
  • Esmaeili, B.; Hallowell, M.R.; Rajagopalan, B. Attribute-Based Safety Risk Assessment. II: Predicting Safety Outcomes Using Generalized Linear Models. J. Constr. Eng. Manag. 2015 , 141 , 04015022. [ Google Scholar ] [ CrossRef ]
  • OSHA. Outreach Training Program—Construction Focus Four Training. Available online: https://www.osha.gov/dte/outreach/construction/focus_four/index.html (accessed on 22 April 2024).
  • Xiao, L.; Tang, L.C.M.; Wen, Y. An Innovative Construction Site Safety Assessment Solution Based on the Integration of Bayesian Network and Analytic Hierarchy Process. Buildings 2023 , 13 , 2918. [ Google Scholar ] [ CrossRef ]
  • Sacks, R.; Whyte, J.; Swissa, D.; Raviv, G.; Zhou, W.; Shapira, A. Safety by design: Dialogues between designers and builders using virtual reality. Constr. Manag. Econ. 2015 , 33 , 55–72. [ Google Scholar ] [ CrossRef ]
  • Han, Y.; Feng, Z.; Zhang, J.; Jin, R.; Aboagye-Nimo, E. Employees’ Safety Perceptions of Site Hazard and Accident Scenes. J. Constr. Eng. Manag. 2019 , 145 , 04018117. [ Google Scholar ] [ CrossRef ]
  • Zhang, J.; Li, J. Applying SEM in studying factors affecting construction workers’ safety behavior. J. Saf. Environ. 2016 , 3 , 182–187. [ Google Scholar ]
  • Fan, X.; Wang, D.; Tong, Z.; Wang, X. Investigation and analysis of the safety risk factors of aging construction workers. Saf. Sci. 2023 , 167 , 106281. [ Google Scholar ] [ CrossRef ]
  • Chen, Q.; Long, D.; Yang, C.; Xu, H. Knowledge Graph Improved Dynamic Risk Analysis Method for Behavior-Based Safety Management on a Construction Site. J. Manag. Eng. 2023 , 39 , 04023023. [ Google Scholar ] [ CrossRef ]
  • Choudhry, R.M.; Fang, D. Why operatives engage in unsafe work behavior: Investigating factors on construction sites. Saf. Sci. 2008 , 46 , 566–584. [ Google Scholar ] [ CrossRef ]
  • Saurin, T.A.; Formoso, C.T.; Cambraia, F.B. Analysis of a safety planning and control model from the human error perspective. Eng. Constr. Arch. Manag. 2005 , 12 , 283–298. [ Google Scholar ] [ CrossRef ]
  • Shapira, A.; Goldenberg, M. AHP-based equipment selection model for construction projects. J. Constr. Eng. Manag. 2005 , 131 , 1263–1273. [ Google Scholar ] [ CrossRef ]
  • Shapira, A.; Simcha, M. AHP-Based Weighting of Factors Affecting Safety on Construction Sites with Tower Cranes. J. Constr. Eng. Manag. 2009 , 135 , 307–318. [ Google Scholar ] [ CrossRef ]
  • Opticrane. Crane Safety Viewing Systems—Opticrane. Available online: https://opticrane.com/products/crane-safety-viewing-systems/ (accessed on 22 April 2024).
  • HoistCam. HoistCam—Home—Wireless Camera for Cranes and Material Handling Equipment. Available online: https://hoistcam.com/ (accessed on 22 April 2024).
  • Wu, B.-J.; Jin, L.-H.; Zheng, X.-Z.; Chen, S. Coupling analysis of crane accident risks based on Bayesian network and the N-K model. Sci. Rep. 2024 , 14 , 1133. [ Google Scholar ] [ CrossRef ] [ PubMed ]
  • Carter, G.; Smith, S.D. Safety hazard identification on construction projects. J. Constr. Eng. Manag. 2006 , 132 , 197–205. [ Google Scholar ] [ CrossRef ]
  • Salvendy, G. Handbook of Human Factors and Ergonomics , 4th ed.; John Wiley & Sons, Inc.: Hoboken, NJ, USA, 2022. [ Google Scholar ]
  • Gillen, M.; Kools, S.; Sum, J.; McCall, C.; Moulden, K. Construction workers’ perceptions of management safety practices: A qualitative investigation. Work 2004 , 23 , 245–256. [ Google Scholar ] [ PubMed ]
  • Menches, C.L.; Chen, J. Using ecological momentary assessment to understand a construction worker’s daily disruptions and decisions. Constr. Manag. Econ. 2013 , 31 , 180–194. [ Google Scholar ] [ CrossRef ]
  • Perlman, A.; Sacks, R.; Barak, R. Hazard recognition and risk perception in construction. Saf. Sci. 2014 , 64 , 22–31. [ Google Scholar ] [ CrossRef ]
  • Shohet, I.M.; Luzi, M.; Tarshish, M. Optimal allocation of resources in construction safety: Analytical-empirical model. Saf. Sci. 2018 , 104 , 231–238. [ Google Scholar ] [ CrossRef ]
  • She, J.; Guo, Z.; Li, Z.; Liang, S.; Zhou, Y. Research on scenario deduction and emergency decision-making evaluation for construction safety accidents. Reliab. Eng. Syst. Saf. 2024 , 251 , 110317. [ Google Scholar ] [ CrossRef ]
  • Saaty, T.L. The analytic hierarchy process (AHP). J. Oper. Res. Soc. 1980 , 41 , 1073–1076. [ Google Scholar ]
  • Dong, Q.; Saaty, T.L. An analytic hierarchy process model of group consensus. J. Syst. Sci. Syst. Eng. 2014 , 23 , 362–374. [ Google Scholar ] [ CrossRef ]
  • Darko, A.; Chan, A.P.C.; Ameyaw, E.E.; Owusu, E.K.; Pärn, E.; Edwards, D.J. Review of application of analytic hierarchy process (AHP) in construction. Int. J. Constr. Manag. 2019 , 19 , 436–452. [ Google Scholar ] [ CrossRef ]
  • Subramanian, N.; Ramanathan, R. A review of applications of Analytic Hierarchy Process in operations management. Int. J. Prod. Econ. 2012 , 138 , 215–241. [ Google Scholar ] [ CrossRef ]
  • Wang, J.-J.; Yang, D.-L. Using a hybrid multi-criteria decision aid method for information systems outsourcing. Comput. Oper. Res. 2007 , 34 , 3691–3700. [ Google Scholar ] [ CrossRef ]
  • Skibniewski, M.J.; Chao, L. Evaluation of Advanced Construction Technology with AHP Method. J. Constr. Eng. Manag. 1992 , 118 , 577–593. [ Google Scholar ] [ CrossRef ]
  • Gamal, Y.A.S.; Saber, A.M.A. Analyzing the application of the analytical hierarchy process in developing a robust risk management framework for construction projects in Egypt. Asian J. Civ. Eng. 2024 , 25 , 3729–3745. [ Google Scholar ] [ CrossRef ]
  • Cabral, M.R.; Blanchet, P. Analytical Hierarchical Process as a Multicriteria Decision Tool in Material Selection for Prefabricated Wood Buildings. Buildings 2023 , 13 , 2973. [ Google Scholar ] [ CrossRef ]
  • Chai, Y.; Wang, Y.; Wang, Y.; Peng, L.; Hou, L. Safety evaluation of human-caused errors in civil aviation based on analytic hierarchy process and fuzzy comprehensive evaluation method. Aircr. Eng. Aerosp. Technol. 2024 , 96 , 826–837. [ Google Scholar ] [ CrossRef ]
  • Aminbakhsh, S.; Gunduz, M.; Sonmez, R. Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects. J. Saf. Res. 2013 , 46 , 99–105. [ Google Scholar ] [ CrossRef ]
  • Khodabocus, S.; Seyis, S. Multi-criteria decision-making model for risk management in modular construction projects. Int. J. Constr. Manag. 2023 , 24 , 240–250. [ Google Scholar ] [ CrossRef ]
  • Kim, J.; Ishdorj, S.; Jeon, J.; Kim, J. Identifying Vital Factors for Enhancing Safety Communication among Foreign Construction Field Workers. Buildings 2024 , 14 , 1714. [ Google Scholar ] [ CrossRef ]
  • Moon, H.; Mirmotalebi, S.; Jang, Y.; Ahn, Y.; Kwon, N. Risk Evaluation of Radioactive Concrete Structure Decommissioning in Nuclear Power Plants Using Fuzzy-AHP. Buildings 2024 , 14 , 1536. [ Google Scholar ] [ CrossRef ]
  • Anjamrooz, T.; El-Sayegh, S.M.; Romdhane, L. Key Portfolio Selection Criteria for Sustainable Construction. Buildings 2024 , 14 , 1777. [ Google Scholar ] [ CrossRef ]
  • Xiang, P.; Yang, Y.; Yan, K.; Jin, L. Identification of Key Safety Risk Factors and Coupling Paths in Mega Construction Projects. J. Manag. Eng. 2024 , 40 , 04024023. [ Google Scholar ] [ CrossRef ]
  • Saah, A.E.N.; Yee, J.-J.; Choi, J.-H. Securing Construction Workers’ Data Security and Privacy with Blockchain Technology. Appl. Sci. 2023 , 13 , 13339. [ Google Scholar ] [ CrossRef ]
  • Ran, R.; Wang, S.; Fang, J.; Wang, Y. Safety Risk Analysis of Urban Viaduct Construction Based on Dynamic Weight. Buildings 2024 , 14 , 1014. [ Google Scholar ] [ CrossRef ]
  • Nikbakht, M.V.; Gheibi, M.; Montazeri, H.; Khaksar, R.Y.; Moezzi, R.; Vadiee, A. Identification and Ranking of Factors Affecting the Delay Risk of High-Rise Construction Projects Using AHP and VIKOR Methods. Infrastructures 2024 , 9 , 24. [ Google Scholar ] [ CrossRef ]
  • Peng, J.L.; Liu, X.; Peng, C.; Shao, Y. Comprehensive factor analysis and risk quantification study of fall from height accidents. Heliyon 2023 , 9 , e22167. [ Google Scholar ] [ CrossRef ]
  • Hinze, J.; Pedersen, C.; Fredley, J. Identifying Root Causes of Construction Injuries. J. Constr. Eng. Manag. 1998 , 124 , 67–71. [ Google Scholar ] [ CrossRef ]
  • Abdelhamid, T.S.; Everett, J.G. Identifying Root Causes of Construction Accidents. J. Constr. Eng. Manag. 2000 , 126 , 52–60. [ Google Scholar ] [ CrossRef ]
  • Newaz, M.T.; Ershadi, M.; Carothers, L.; Jefferies, M.; Davis, P. A review and assessment of technologies for addressing the risk of falling from height on construction sites. Saf. Sci. 2021 , 147 , 105618. [ Google Scholar ] [ CrossRef ]
  • Shafei, H.; Rahman, R.A.; Lee, Y.S. Evaluating Construction 4.0 technologies in enhancing safety and health: Case study of a national strategic plan. J. Eng. Des. Technol. 2024; ahead-of-print . [ Google Scholar ] [ CrossRef ]
  • Rasouli, S.; Alipouri, Y.; Chamanzad, S. Smart Personal Protective Equipment (PPE) for construction safety: A literature review. Saf. Sci. 2024 , 170 , 106368. [ Google Scholar ] [ CrossRef ]
  • Alizadehsalehi, S.; Yitmen, I.; Celik, T.; Arditi, D. The effectiveness of an integrated BIM/UAV model in managing safety on construction sites. Int. J. Occup. Saf. Ergon. 2020 , 26 , 829–844. [ Google Scholar ] [ CrossRef ]

Click here to enlarge figure

Question NumberQuestion DraftingMeanStandard Deviation
1How do you assess safety on a construction site during the swinging of cargo using a crane? For example, how would you evaluate safety during the swinging of a concrete heater for wall casting?7.232.27
2To what extent do you estimate that the implementation of hazardous situation identification technology would enhance the safety rating in the scenario described in the previous question?7.771.66
3What safety rating would you assign to the execution of plaster works on the balcony bottom at the construction site where you work?6.631.53
4To what extent do you estimate that using a body camera for identifying hazardous situations would improve the safety rating for the execution of plaster works on the balcony bottom as mentioned in the previous question?7.831.83
5What safety rating would you assign to the execution of works on the building’s exterior fronts (e.g., exterior plaster, rigid cover, etc.)?6.661.45
6To what extent do you estimate that using a European scaffold would improve the safety rating in the previous question?7.431.79
7What safety rating would you assign to the construction site while a cement mixer is entering it?6.312.2
8To what extent do you estimate that an extra worker, whose duty is only to direct the entrance and exit to the construction site, would improve the safety rating in the previous question?8.971.03
9On a scale of 1–10, please rate the level of safety that you feel during daily work on the construction site.6.771.64
Worker #Do You Have Any Suggestions for Improving Safety in Construction Sites?
Worker 1Enforcing
Worker 2Order and organization
Worker 3
Worker 4
Worker 5
Worker 6Guidance days for workers, conducting surprise inspections, and more…
Worker 7More supervision, confirming regulations implementation, strict punishment
Worker 8
Worker 9
Worker 10
Worker 11I believe a more effective approach would involve continuous supervision with a wide reach. This means having safety supervisors and project safety agents closely connected to the ongoing work. Regular site tours would help identify potential hazards, including pre-planned risky situations. Implementing safety protocols for specific tasks, along with clear instructions and appropriate consequences, would enhance the overall safety of the construction site.
Worker 12
Worker 13To make sure that foremen will take care of safety and not execution
Worker 14From my perspective, safety professionals are increasingly burdened with safety paperwork to shift accountability. However, prioritizing worker advocacy holds greater significance. It is essential to prioritize worker safety and find solutions for safe work practices, even if it increases project costs. In summary, prioritizing safety over cost savings is critical: it’s the cause of disasters.
Worker 15
Worker 16A safety representative will enter hazardous areas and oversee safety.
Worker 17Due to the limitations of a foreman, separate manpower is necessary to supervise both work-in-progress and safety domains.
Worker 18
Worker 19
Worker 20
Worker 21To enhance safety on construction sites, it is essential to provide guidance and strict supervision and utilize technological means for monitoring and improving worker behavior. Lessons learned and recommendations should be implemented.
Worker 22Consider appointing a safety officer responsible for daily safety inspections, with the authority to suspend workers who violate safety rules, even minor ones, and impose fines. This appointment should be made by the project owner rather than the contractor.
Worker 23Providing instructions to workers and imposing fines for safety violations
Worker 24
Worker 25
Worker 26
Worker 27
Worker 28
Worker 29
Worker 30
Worker 31
Worker 32
Worker 33After the main contractor has fulfilled all requirements related to equipment and guidance, the constructor is allowed to impose fines on workers or subcontractors who violate the safety orders they have agreed to
Worker 34Implement ongoing education programs for management and work teams.
Worker 35
The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Share and Cite

Zeibak-Shini, R.; Malka, H.; Kima, O.; Shohet, I.M. Analytical Hierarchy Process for Construction Safety Management and Resource Allocation. Appl. Sci. 2024 , 14 , 9265. https://doi.org/10.3390/app14209265

Zeibak-Shini R, Malka H, Kima O, Shohet IM. Analytical Hierarchy Process for Construction Safety Management and Resource Allocation. Applied Sciences . 2024; 14(20):9265. https://doi.org/10.3390/app14209265

Zeibak-Shini, Reem, Hofit Malka, Ovad Kima, and Igal M. Shohet. 2024. "Analytical Hierarchy Process for Construction Safety Management and Resource Allocation" Applied Sciences 14, no. 20: 9265. https://doi.org/10.3390/app14209265

Article Metrics

Article access statistics, further information, mdpi initiatives, follow mdpi.

MDPI

Subscribe to receive issue release notifications and newsletters from MDPI journals

IMAGES

  1. Risk Management and Project Management

    risk management in project management research paper

  2. How to Manage Risk in Any Project in 10 Steps?

    risk management in project management research paper

  3. Risk Management Techniques In Project Management

    risk management in project management research paper

  4. Risk Management and Project Management

    risk management in project management research paper

  5. (PDF) Project Risk Management: Use and Benefit of Various Tools

    risk management in project management research paper

  6. What are the Risk Management Roles in Projects and Programs?

    risk management in project management research paper

VIDEO

  1. Decathlon: Supply Chain Management

  2. How to Develop a Risk Management Plan (Animated)

  3. Project Risk Management

  4. What is on a Risk Register?

  5. Project Risk Management

  6. Risk Management

COMMENTS

  1. (PDF) Project risk management: A review of an institutional project

    This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and ...

  2. (PDF) The Essence of Risk Identification in Project Risk Management: An

    Risk identification is a challenging process in the management of project risks. Most project managers tend to spend less time in identifying risks and more time in risk mitigation, ignoring the ...

  3. The Effectiveness of Risk Management: An Analysis of Project Risk

    Results of this study show that project context--industry and country where a project is executed--significantly impacts perceived levels of project risk, and the intensity of risk management ...

  4. Successful implementation of project risk management in small and

    A common definition of risk related to PM is an uncertain event or condition that, if takes place, has both negative and positive effects on the project's objectives (PMI, 2017; ISO 31000, 2018; Pritchard and PMP, 2014; A Project risk management in SMEs PM, 2004; TSO, 2009). Therefore, organizations must achieve, through PRM, a balance between ...

  5. Beyond probability-impact matrices in project risk management: A

    This paper studies how the risk matrix is adopted by a large majority of standards, norms and methodologies in project management and, at the same time, practitioners and academics recognise it as ...

  6. The Effectiveness of Risk Management: An Analysis of Project Risk

    CURRENT PROJECT RISK MANAGEMENT PRACTICES A project is defined as any series of activities and tasks that have a specific objective to be completed within certain specifications, have defined start and end dates, and funding limits.(10) As project managers increasingly have to deal with higher levels of uncertainty, risk management has become a ...

  7. Narratives of Project Risk Management: From Scientific Rationality to

    Yet empirical research, which seeks to demonstrate causality between the use of project risk management and project success, remains at best stubbornly inconclusive (Willumsen et al., 2019). It is further widely accepted that the actuality of risk management invariably differs from current mainstream prescriptions (Olechowski et al., 2016 ...

  8. Successful implementation of project risk management in small and

    project risk management in small and medium enterprises: a cross-case analysis Priscila Ferreira de Araujo Lima Management and Engineering, School of Engineering, University of Padova, Padova, Italy Sara Marcelino-Sadaba ... Paper type Research paper 1. Introduction Risk Management (RM) is a very relevant process that can be related to many ...

  9. Risk management in traditional and agile project management

    The authors of the research of the project management (Knap 2018) say that two of the three main reasons of failing the internal projects in the companies are the insufficient support of the top management and an inadequate risk treatment. ... Acknowledgements Publication of this paper was supported by Cultural and Educational Grant Agency of ...

  10. Project Risk Management Methodology

    The key to risk management is the quantification of risk, and the use of software tools to reduce the impact of risk on project schedules. Indeed, with the increasing power of the computer, with better and easier-to-use software, with more and better data available, and with increasing pressures to manage projects effectively.

  11. PDF WORKING Quantitative Risk Analysis for Project Management

    Development (IR&D) project "Risk Management and Risk Analysis for Complex Projects: Developing a Research Agenda." The aim of the project was to survey how quantitative risk management and risk analysis methods were applied to the planning and execution of complex projects, particularly those which planned to utilize new and untried ...

  12. PDF Richard Lomothey Risk Management

    as to whether risk management is necessary in project management or not. In an effort to clarify this doubt, this research will focus on obtaining the perspectives or views of practicing project managers on risk management. This study will bring out the views of practicing project management professionals on risk management.

  13. (PDF) Risk Management in Software Development Projects: Systematic

    The research presented in this article considers how residual risk impacts project performance and: (1) evaluates the impact of specific categories of residual risks (actor, technology, task, and ...

  14. Managing overall project risk

    This paper clarifies the concept of overall project risk, as distinct from individual risk, a topic which tends to be overlooked in risk management discourse. The author provides an overview of current risk standards, explains distinctions between different risk levels, and describes the limitations of current risk management practice. Reviewing various risk assessment models, a holistic ...

  15. A Method for Risk Response Planning in Project Portfolio Management

    He has published numerous research articles on different planning aspects of supply chains and service systems, risk analysis, project management, and financial engineering. He is a professional expert in developing efficient mathematical solutions and business analytics for complex management problems based on optimization, graph theory, game ...

  16. (Pdf) Exploring the Upside of Risk in Project Management: a

    Risk management is used to identify, assess, and respond to uncertainties. In project management, risks can be categorized as either threats (negative events or conditions) or opportunities ...

  17. PDF Risk Management Practices in a Construction Project a case study

    A master's thesis that investigates how risk and risk management process is perceived and applied in a school project by Bygg-Fast, a consultancy company. The thesis uses a theoretical framework based on project life cycle, risk definition, risk management process and methods, and interviews with project participants.

  18. Project Risk Management Research Papers

    To minimize human efforts, a well-defined risk management model along with a supporting tool is required. The purpose of this paper is to review the risk management processes in traditional and agile method of project management. This paper highlights the underlying risk management model used in tools used for agile approach of project management.

  19. Identifying 8 Key Project Management Risks

    In project management, "risk" refers to unforeseen circumstances or events that could affect the project's goals. These risks may hamper project progress, manifesting as delays, cost overruns, or poor quality outcomes. Risks, by their very nature, add unpredictability and variability to project outcomes, which may fail or be less than ...

  20. (PDF) PROJECT RISK MANAGEMENT

    This chapter explained the concept of risk management in construction in relation to project success. The types of risks were examined based on the date of identification which are: Known risk ...

  21. Analytical Hierarchy Process for Construction Safety Management and

    The construction industry plays a crucial role in contributing to the economy and developing sustainable infrastructures. However, it is known as one of the most dangerous industrial domains. Over the years, special attention has been paid to developing models for managing and planning construction safety. Many research studies have been carried out to analyze the root causes of fatal ...

  22. Project portfolio risk management: a structured literature review with

    project portfolio management; project portfo lio risk management; structured literature review; research opportunities. DOI: 10.12821/ijispm08 0304 Manuscript received: 3 December 2019